PROFITFLOW / WMS · Materials and inventory

Know what you have, where it is and what is reserved.

Manage materials and finished goods in ProfitFlow, or connect your current WMS. Link inventory movements to orders and costs.

ILLUSTRATIVE VIEW · SAMPLE DATA

Warehouse / Zone A

A-01240
A-02180
A-03120
A-04360
A-0580
A-06150
AvailableReserved
Issue linked to OP-1042Material → Production → Finished goods
Conceptual illustration of a corrugated packaging plantPLANT → RECORDS → DECISIONS

THE CONNECTED OPERATION

From material receipts to delivered orders.

Each movement retains its origin, destination and order so you can understand availability and consumption.

  1. 01Receipt
  2. 02Location / batch
  3. 03Reserve / consume
  4. 04Dispatch

01

Receipts and locations

Record received materials, supplier, unit of measure, batch and location. Distinguish available, reserved and inspection stock.

02

Consumption by order

Link issues, returns, scrap and remnants to their order. Compare recorded usage with quoted consumption.

03

Finished goods

Record completed quantities, customer products, locations, shipment preparation and dispatch. Keep the link with production and delivery.

04

Alerts and stock counts

Set minimum levels, review shortages and count stock with authorized adjustments. Reusing remnants requires checking dimensions, material and condition.

YOUR STARTING POINT

Use ProfitFlow or connect your existing systems.

01 / PROFITFLOW

No MES or WMS yet?

Start with ProfitFlow modules: record production, assembly, stock and costs from compatible computers or tablets.

MESWMSCost Engine
02 / INTEGRATIONS

Already using software?

Connect available ERP, MES, WMS or CRM data through agreed files or interfaces. Keep the tools that work for your team.

ERPCRMExcel / API

Grow in phases

Manual records → validated workflows → integrations → PLCs, sensors or cameras when the use case is viable.

Connections are evaluated for compatibility, available data and agreed scope.

Software that fits your operation.

Scope, configuration, support and future expansions are defined in the proposal. Automation and ML require validated data; no universal savings are promised.

Let’s review your plant →